Project Management

A project plan is inclusive of defining and authenticating the project objectives and targets, the route to achieving them, determining tasks and evaluating the assets, shaping the budget required and framing timelines for its completion. Project management furthermore comprises of a project plan.

In addition to a project plan, project management also consists of managing the execution of the project plan, along with operating regular 'controls' to ensure that there is accurate and objective information on 'performance' relative to the plan, and the mechanisms to implement recovery actions wherever crucial.

HCS APPROACH FOR INTEGRATION

 

Analyzing

Application development environment commencing with:

  • Reviewing the software development process.
  • Identifying current challenges, limitations and timeline restrictions.
  • Development of a working integration between vendor development team and HCS development team.
  • Ascertaining the objectives, assumptions, and restraints.
  • Developing a test plan to document to incorporate critical business flows and user architecture definitions with sections on vulnerabilities, resiliency, physical, logical, database, and network security.

 

Integration Design

  • Design information.
  • Structure simulation models.
  • Develop simulation scenarios.
  • Analysis and confirmation of simulation scenarios

 

Proof Of Concept

  • Framing a fully functioning test of the developed integration of vendor application.
  • Definitions and adoptions of data sources, metadata, and their storages.
  • Conducting the test development work at client facility with a frequent conversation with client/vendor subject matter expert (SME).

 

Test Operation

  • Uses the delivered test to identify performance barriers and distorted functions.
  • Analyses team to identify the root cause and recommends steps to mitigation of performance and functional problems.
  • Extensibility and scalability, seeming less support for heterogeneity.

 

Modeling

  • Process modeling requirements.
  • Requirements for links between the scenario and adjacent layers.
  • Building simulation model layer.
  • An interface is required that translates the data contained in a populated aspect.
  • Representation that has been associated with each “analysis function model”.
  • Requirements for analysis functions.

 

Prototype

  • Analysis functions are the key to the connection of the scenario layer with the building simulation model and the software application in the tool layer.
  • Data exchange interfaces to software applications.
  • Prototype demo.
  • Conclusion and remarks.

HCS integration methodology follows these steps in this order:

our-vision

 

User architecture modeling

Identifies 2 to 3 typical business flows for users of the application. It also diagnoses operational test data used to operate the business flows.

 

Functional testing

This testing process operates a business flow as a single user would use the application in the real-world. This is the time to remove any bugs or issues in the way the test interacts with the application's user interface.

 

Functional test with operational test data

This operates a business flow using data from a data source. For example, the test uses a comma separated file of id/passwords for a sign-in form in the application. This is the time to solve any problems where the application reacts differently to the operational test data being input and scalability of the efficient mechanisms for storage, manipulation, retrieval and use of large ontology and mappings.

 

Load and performance testing

The function of this testing process is that the system is tested in a given number of simulated users. This identifies the scalability index of the application under test, more powerful reasoning to ensure the semantic integrity of mappings. This also identifies application functions that break or perform poorly under pressure. This is the time to hand-off the working test to your team.

 

Root Cause Analysis

Uses monitor data to identify issues in the application that prevent achievement of performance goals.

 

Training

Teaches client team to operate and implement.

 

System Implementation

Systems implementation is a record in resume of every consultant in HCS. We hire professional consultant , train them , deliver knowledge transfer between produce provider consultants and our local consultants. HCS consultants have very special knowledge of delivered solutions capabilities along with local users cultural knowledge and talent in communication skills.